Pre-assembly of offshore wind turbines aims to optimize the use of installation vessels reducing the number of lifts needed in offshore conditions and ensure the assets mechanical completion is achieved in a controlled environment. Pre-assembly of offshore wind
This role required candidate to permanently relocate at Jubail, Saudi Arabia. About the Company Founded in the late 1970s in Saudi Arabias oil-rich region, this multinational corporation has solidified its position as a global leader in